Contract packages with Thang Long Thermal Power Joint Stock Company

Date post: 12-09-2020 | Admin

We went to Thang Long Thermal Power Plant to start two packages of Group 6 safety team Training Contract and perform a full risk assessment package for the plant in beautiful autumn weather and with beautiful Ha Long.

Really impressed with a professional and well-organized private factory. These contract packages to get us all have to go through the methodical bidding steps that many foreign companies do not have, so we are very eager to see with our own eyes how the factory is. And it really does not meet the expectations of those who work from the landscape, rooms, facilities related to safety, working methods and people here.

A lovely weekend!